COMPEIIIING QUALITY

A BRIGHT, SPACIOUS OFFICE BUILDING WITH EXCELLENT FACILITIES, OFFERING THE HIGHEST QUALITY WORKING ENVIRONMENT.

CAREFUIIICONSIDERED

1 | DESIGN CRITERIA

  • Heating, cooling and ventilation
  • Occupancy base build capacity

2 | MECHANICAL & ELECTRICAL DESIGN CRITERIA

  • Occupancy design criteria building services
  • Office accommodation services design criteria
  • Ventilation systems
  • Additional cooling
  • Building services
  • Means of escape – building
  • Showers
  • Cycles
  • Lift passenger
  • Connectivity

3 | REFUSE DISPOSAL

Refuse disposal via the Loading bay and currently the building splits all waste generated in the building into 5 waste streams;

  • General waste
  • Dry mixed recyclables
  • Glass
  • Cardboard
  • Coffee bean grindings from the coffee bar are separated out and collected on a weekly basis.

4 | ACCESS AND EGREE

  • Main access is through the ground floor entrance which is manned 365 days a year
  • Deliveries and servicing to the building is via the secured and manned loading bay accessed from Elizabeth Street.
  • Cycle access is via the loading bay.
  • CCTV system is provided to monitor the external doors and loading bay.

5 | TENANTS PLANT

  • Rooftop space is available for plant.